Triple

T17723341
Position Surface form Disambiguated ID Type / Status
Subject Treaty of Itaipu E442396 entity
Predicate involvesInfrastructure P19374 FINISHED
Object Itaipu Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Itaipu Dam | Statement: [Treaty of Itaipu, involvesInfrastructure, Itaipu Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Itaipu Dam
Context triple: [Treaty of Itaipu, involvesInfrastructure, Itaipu Dam]
  • A. Itaipu Dam chosen
    Itaipu Dam is a massive hydroelectric power plant on the Brazil–Paraguay border, once the world’s largest in installed capacity and still one of the most important sources of renewable energy in South America.
  • B. Yacyretá Dam
    The Yacyretá Dam is a large hydroelectric power plant on the border between Argentina and Paraguay that generates electricity by harnessing the flow of the Paraná River.
  • C. Salto Grande Dam
    Salto Grande Dam is a large hydroelectric dam and binational power station on the Uruguay River, jointly operated by Argentina and Uruguay.
  • D. Belo Monte Dam
    The Belo Monte Dam is a massive hydroelectric complex in Brazil’s Amazon region, known for its high power capacity and significant environmental and social controversy.
  • E. Barra Bonita Dam
    Barra Bonita Dam is a hydroelectric and navigation dam complex in the state of São Paulo, Brazil, known for regulating the Tietê River and forming the Barra Bonita Reservoir.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9ec79688190b86bdcef85a7b3aa completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e47487b4988190b14237a4e6376e9a completed April 19, 2026, 6:21 a.m.
Created at: April 10, 2026, 10:07 a.m.