Triple

T17721448
Position Surface form Disambiguated ID Type / Status
Subject Opal network E442345 entity
Predicate fullRolloutCompleted P73878 FINISHED
Object 2014 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2014 | Statement: [Opal network, fullRolloutCompleted, 2014]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: fullRolloutCompleted
Context triple: [Opal network, fullRolloutCompleted, 2014]
  • A. fullOpeningCompleted
    Indicates that the action or process of fully opening something has been completed.
  • B. rollout chosen
    Indicates the action of introducing or deploying something (such as a product, feature, or policy) from a limited or initial state to broader or full availability over time.
  • C. fullyAppliedTo
    Indicates that an action, function, or process has been completely and exhaustively applied to a target entity, with no remaining parameters or partial application.
  • D. hasCompleted
    Indicates that an entity has finished or successfully carried out a specified task, process, or activity.
  • E. wentFullyOnline
    Indicates that an entity transitioned from a non-online or partially online state to operating entirely online.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9ec79688190b86bdcef85a7b3aa completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e47486438c8190abe27eb4eb2c6fdf completed April 19, 2026, 6:21 a.m.
PD Predicate disambiguation batch_69e3cde601d4819097903f471f1fe99a completed April 18, 2026, 6:31 p.m.
Created at: April 10, 2026, 10:07 a.m.