Triple

T17688348
Position Surface form Disambiguated ID Type / Status
Subject Nam Ou 1 Dam E440955 entity
Predicate partOf P40 FINISHED
Object Nam Ou hydropower cascade NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Nam Ou hydropower cascade | Statement: [Nam Ou 1 Dam, partOf, Nam Ou hydropower cascade]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Nam Ou hydropower cascade
Context triple: [Nam Ou 1 Dam, partOf, Nam Ou hydropower cascade]
  • A. Tri An Hydropower Plant
    Tri An Hydropower Plant is a major hydroelectric power station in southern Vietnam that generates electricity from the Dong Nai River and supports regional power supply and water management.
  • B. Agus River hydropower complex
    The Agus River hydropower complex is a major series of hydroelectric power plants and related infrastructure along the Agus River in Mindanao, Philippines, that supplies a significant portion of the island’s electricity.
  • C. Karuma Hydropower Station
    Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
  • D. Doyang Hydro Project
    Doyang Hydro Project is a hydroelectric power and irrigation facility located on the Doyang River in Nagaland, India.
  • E. Nam Ngum 5 Hydropower Project
    The Nam Ngum 5 Hydropower Project is a hydroelectric power development in Laos that harnesses the Nam Ngum River to generate electricity for the country’s energy grid and regional power exports.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Nam Ou hydropower cascade
Target entity description: The Nam Ou hydropower cascade is a series of large hydroelectric dams developed along Laos’s Nam Ou River to generate power and support regional energy infrastructure.
  • A. Tri An Hydropower Plant
    Tri An Hydropower Plant is a major hydroelectric power station in southern Vietnam that generates electricity from the Dong Nai River and supports regional power supply and water management.
  • B. Agus River hydropower complex
    The Agus River hydropower complex is a major series of hydroelectric power plants and related infrastructure along the Agus River in Mindanao, Philippines, that supplies a significant portion of the island’s electricity.
  • C. Karuma Hydropower Station
    Karuma Hydropower Station is a major hydroelectric power plant in Uganda that harnesses the flow of the Victoria Nile to generate electricity for the national grid.
  • D. Doyang Hydro Project
    Doyang Hydro Project is a hydroelectric power and irrigation facility located on the Doyang River in Nagaland, India.
  • E. Nam Ngum 5 Hydropower Project
    The Nam Ngum 5 Hydropower Project is a hydroelectric power development in Laos that harnesses the Nam Ngum River to generate electricity for the country’s energy grid and regional power exports.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d8b9e940b081908b862bb0e6e89b0d completed April 10, 2026, 8:50 a.m.
NER Named-entity recognition batch_69e4704944d8819089b153aa14839fc0 completed April 19, 2026, 6:03 a.m.
Created at: April 10, 2026, 10:03 a.m.