Triple

T1767845
Position Surface form Disambiguated ID Type / Status
Subject Adachi E38804 entity
Predicate locatedOn P40 FINISHED
Object Arakawa River E249387 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Arakawa River | Statement: [Adachi, locatedOn, Arakawa River]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Arakawa River
Context triple: [Adachi, locatedOn, Arakawa River]
  • A. Arakawa River chosen
    The Arakawa River is a major river in the Tokyo region of Japan, known for its extensive flood control systems and role in shaping the urban landscape.
  • B. Yamato River
    The Yamato River is a major river in Japan’s Kansai region that flows through Nara and Osaka Prefectures before emptying into Osaka Bay.
  • C. Yoshino River
    The Yoshino River is one of Japan’s major rivers, renowned for its strong currents, hydroelectric dams, and scenic gorges as it flows across the island of Shikoku.
  • D. Mukogawa River
    The Mukogawa River is a prominent river in Japan’s Hyōgo Prefecture that flows through cities such as Nishinomiya before emptying into Osaka Bay.
  • E. Shinano River
    The Shinano River is Japan’s longest river, flowing through central Honshu before emptying into the Sea of Japan.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8862e61708190af97b9838cc3f5de completed March 4, 2026, 7:21 p.m.
NER Named-entity recognition batch_69aa648bb44c81909245fb7ee23cb132 completed March 6, 2026, 5:22 a.m.
NED1 Entity disambiguation (via context triple) batch_69aea8367a288190ac4dcd2f06505982 completed March 9, 2026, 11 a.m.
Created at: March 4, 2026, 7:31 p.m.