Triple
T17659910
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Office of the Fire Marshal (San Bernardino County) |
E440221
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | fire prevention authority |
C8085
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: fire prevention authority Context triple: [Office of the Fire Marshal (San Bernardino County), instanceOf, fire prevention authority]
-
A.
fire prevention engineer
A fire prevention engineer is a professional who designs, evaluates, and implements systems, codes, and strategies to minimize fire risks and ensure life safety in buildings and facilities.
-
B.
fire protection engineering department
A fire protection engineering department is an organizational unit responsible for the planning, design, implementation, and oversight of systems, policies, and practices that prevent, detect, and control fires to protect people, property, and the environment.
-
C.
firefighting organization
chosen
A firefighting organization is a coordinated group responsible for preventing, controlling, and extinguishing fires, as well as responding to related emergencies to protect life, property, and the environment.
-
D.
fire service standard
A fire service standard is a formalized set of criteria, procedures, and performance requirements that guide the organization, operation, safety, and effectiveness of fire and emergency response services.
-
E.
fire station
A fire station is a facility that houses firefighting personnel, vehicles, and equipment, serving as a base for emergency response and community safety operations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d8b9e87e18819087104a44dc4dc5b1 |
completed | April 10, 2026, 8:50 a.m. |
Created at: April 10, 2026, 9:40 a.m.