Triple

T17655472
Position Surface form Disambiguated ID Type / Status
Subject Pohořelice E429610 entity
Predicate locatedOnRoute P6309 FINISHED
Object Brno–Vienna corridor NE NERFINISHED

Named-entity recognition

Before disambiguation, gpt-5-mini classified whether the object phrase is a named entity — the step behind the object's NE type shown above.

Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Brno–Vienna corridor | Statement: [Pohořelice, locatedOnRoute, Brno–Vienna corridor]

Disambiguation candidates (2 decisions)

The exact options the model was shown at each disambiguation step, with the option it chose highlighted — the evidence behind this triple's disambiguated ids.

NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Brno–Vienna corridor
Context triple: [Pohořelice, locatedOnRoute, Brno–Vienna corridor]
  • A. Prague–Nuremberg corridor
    The Prague–Nuremberg corridor is a major trans-European transport route linking the Czech capital Prague with the German city of Nuremberg, facilitating significant regional and international traffic and trade.
  • B. Prague–Vienna railway
    The Prague–Vienna railway is a major international rail route connecting the Czech capital Prague with Austria’s capital Vienna, serving as an important corridor for both passenger and freight transport in Central Europe.
  • C. Berlin–Prague–Vienna transport corridor
    The Berlin–Prague–Vienna transport corridor is a major trans-European route linking the German, Czech, and Austrian capitals by an integrated network of rail and road infrastructure.
  • D. Hungary–Austria road corridor
    The Hungary–Austria road corridor is a major cross-border transport route linking Hungary and Austria and facilitating regional travel and trade between the two countries.
  • E. Ostrava–Bohumín line
    The Ostrava–Bohumín line is a key railway route in the Czech Republic that connects the industrial city of Ostrava with the town of Bohumín and forms part of major national and international rail corridors.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Brno–Vienna corridor
Target entity description: The Brno–Vienna corridor is a major Central European transport and development axis linking the Czech city of Brno with Austria’s capital Vienna, supporting regional connectivity and economic integration.
  • A. Prague–Nuremberg corridor
    The Prague–Nuremberg corridor is a major trans-European transport route linking the Czech capital Prague with the German city of Nuremberg, facilitating significant regional and international traffic and trade.
  • B. Prague–Vienna railway
    The Prague–Vienna railway is a major international rail route connecting the Czech capital Prague with Austria’s capital Vienna, serving as an important corridor for both passenger and freight transport in Central Europe.
  • C. Berlin–Prague–Vienna transport corridor
    The Berlin–Prague–Vienna transport corridor is a major trans-European route linking the German, Czech, and Austrian capitals by an integrated network of rail and road infrastructure.
  • D. Hungary–Austria road corridor
    The Hungary–Austria road corridor is a major cross-border transport route linking Hungary and Austria and facilitating regional travel and trade between the two countries.
  • E. Ostrava–Bohumín line
    The Ostrava–Bohumín line is a key railway route in the Czech Republic that connects the industrial city of Ostrava with the town of Bohumín and forms part of major national and international rail corridors.
  • F. None of above. chosen

Provenance (2 batches)

Stage Batch ID Job type Status
creating batch_69d889e2c2608190b762e76d9b2262f1 elicitation completed
NER batch_69e46e40e344819086a49c69f8f2956b ner completed
Created at: April 10, 2026, 6:06 a.m.