Triple

T17629659
Position Surface form Disambiguated ID Type / Status
Subject Drac E429940 entity
Predicate hasDam P8736 FINISHED
Object Monteynard-Avignonet Dam NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Monteynard-Avignonet Dam | Statement: [Drac, hasDam, Monteynard-Avignonet Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Monteynard-Avignonet Dam
Context triple: [Drac, hasDam, Monteynard-Avignonet Dam]
  • A. Serre-Ponçon Dam
    Serre-Ponçon Dam is a large hydroelectric and irrigation dam in southeastern France that creates one of Western Europe’s biggest artificial lakes.
  • B. Grandval Dam
    Grandval Dam is a large hydroelectric dam in southern France, known for impounding the Truyère River to form the Lac de Grandval reservoir.
  • C. Vouglans Dam
    Vouglans Dam is a large hydroelectric dam on the Ain River in eastern France, known for forming one of the country’s biggest artificial lakes and generating renewable energy.
  • D. Dam of Châtelot
    The Dam of Châtelot is a major hydroelectric dam on the Franco-Swiss border that harnesses the Doubs River to generate renewable electricity.
  • E. Pougny–Chancy hydroelectric dam
    The Pougny–Chancy hydroelectric dam is a power-generating dam on the Rhône River at the France–Switzerland border, supplying renewable electricity to the surrounding region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Monteynard-Avignonet Dam
Target entity description: Monteynard-Avignonet Dam is a large hydroelectric dam in southeastern France that creates the Lac de Monteynard-Avignonet reservoir, known for both power generation and water sports.
  • A. Serre-Ponçon Dam
    Serre-Ponçon Dam is a large hydroelectric and irrigation dam in southeastern France that creates one of Western Europe’s biggest artificial lakes.
  • B. Grandval Dam
    Grandval Dam is a large hydroelectric dam in southern France, known for impounding the Truyère River to form the Lac de Grandval reservoir.
  • C. Vouglans Dam
    Vouglans Dam is a large hydroelectric dam on the Ain River in eastern France, known for forming one of the country’s biggest artificial lakes and generating renewable energy.
  • D. Dam of Châtelot
    The Dam of Châtelot is a major hydroelectric dam on the Franco-Swiss border that harnesses the Doubs River to generate renewable electricity.
  • E. Pougny–Chancy hydroelectric dam
    The Pougny–Chancy hydroelectric dam is a power-generating dam on the Rhône River at the France–Switzerland border, supplying renewable electricity to the surrounding region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e37f308190a6aa0a69daff86c7 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e46dbf59dc8190a56aa4a2449b2e2e completed April 19, 2026, 5:53 a.m.
Created at: April 10, 2026, 5:52 a.m.