Triple

T17626663
Position Surface form Disambiguated ID Type / Status
Subject Fagernes–Hønefoss road E429861 entity
Predicate partOfTransportCorridor P6309 FINISHED
Object E16 corridor NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: E16 corridor | Statement: [Fagernes–Hønefoss road, partOfTransportCorridor, E16 corridor]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: E16 corridor
Context triple: [Fagernes–Hønefoss road, partOfTransportCorridor, E16 corridor]
  • A. E20 corridor
    The E20 corridor is a major trans-European railway route running through Poland that forms part of an important east–west transport link connecting Western and Eastern Europe.
  • B. M-85 corridor
    The M-85 corridor is a major transportation route in the Detroit–Windsor region that integrates key crossings and roadways to facilitate cross-border traffic and regional connectivity.
  • C. Hume corridor
    The Hume corridor is a major transport and development axis in southeastern Australia that links Sydney and Melbourne through a chain of growing regional centres along the Hume Highway and rail line.
  • D. M40 corridor
    The M40 corridor is a key transport and development belt in England running alongside the M40 motorway, linking London with the Midlands and encompassing a series of commuter towns and commercial hubs.
  • E. M4 corridor
    The M4 corridor is a major economic and transport region in southern England, running along the M4 motorway and known for its concentration of technology companies and business hubs.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: E16 corridor
Target entity description: The E16 corridor is a major European route and transport corridor in Norway that connects key inland regions and facilitates travel between Oslo and western Norway.
  • A. E20 corridor
    The E20 corridor is a major trans-European railway route running through Poland that forms part of an important east–west transport link connecting Western and Eastern Europe.
  • B. M-85 corridor
    The M-85 corridor is a major transportation route in the Detroit–Windsor region that integrates key crossings and roadways to facilitate cross-border traffic and regional connectivity.
  • C. Hume corridor
    The Hume corridor is a major transport and development axis in southeastern Australia that links Sydney and Melbourne through a chain of growing regional centres along the Hume Highway and rail line.
  • D. M40 corridor
    The M40 corridor is a key transport and development belt in England running alongside the M40 motorway, linking London with the Midlands and encompassing a series of commuter towns and commercial hubs.
  • E. M4 corridor
    The M4 corridor is a major economic and transport region in southern England, running along the M4 motorway and known for its concentration of technology companies and business hubs.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e37f308190a6aa0a69daff86c7 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e46dbd122c8190a5db8c0088c81034 completed April 19, 2026, 5:53 a.m.
Created at: April 10, 2026, 5:52 a.m.