Triple
T17626520
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Teles Pires River |
E429857
|
entity |
| Predicate | hasHydroelectricPlant |
P15311
|
FINISHED |
| Object | Colíder Dam |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Colíder Dam | Statement: [Teles Pires River, hasHydroelectricPlant, Colíder Dam]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Colíder Dam Context triple: [Teles Pires River, hasHydroelectricPlant, Colíder Dam]
-
A.
Pardee Dam
Pardee Dam is a concrete arch dam in California that forms Pardee Reservoir, providing water storage, hydroelectric power, and flood control for the Mokelumne River system.
-
B.
Pathfinder Dam
Pathfinder Dam is a historic early 20th-century masonry dam in Wyoming that forms Pathfinder Reservoir and provides water storage and flood control on the North Platte River.
-
C.
Tieton Dam
Tieton Dam is a concrete multiple-arch dam in central Washington State that provides irrigation water storage, flood control, and hydroelectric power as part of the U.S. Bureau of Reclamation’s Yakima River basin developments.
-
D.
O’Neill Dam
O’Neill Dam is an earthfill embankment dam in California that forms the O’Neill Forebay as part of the state’s Central Valley Project water storage and conveyance system.
-
E.
Fengman Dam
Fengman Dam is a large hydroelectric gravity dam on the Songhua River in Jilin Province, China, known for its significant role in regional power generation and flood control.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Colíder Dam Target entity description: Colíder Dam is a hydroelectric power plant in Brazil that generates electricity on the Teles Pires River as part of the country’s Amazon basin energy infrastructure.
-
A.
Pardee Dam
Pardee Dam is a concrete arch dam in California that forms Pardee Reservoir, providing water storage, hydroelectric power, and flood control for the Mokelumne River system.
-
B.
Pathfinder Dam
Pathfinder Dam is a historic early 20th-century masonry dam in Wyoming that forms Pathfinder Reservoir and provides water storage and flood control on the North Platte River.
-
C.
Tieton Dam
Tieton Dam is a concrete multiple-arch dam in central Washington State that provides irrigation water storage, flood control, and hydroelectric power as part of the U.S. Bureau of Reclamation’s Yakima River basin developments.
-
D.
O’Neill Dam
O’Neill Dam is an earthfill embankment dam in California that forms the O’Neill Forebay as part of the state’s Central Valley Project water storage and conveyance system.
-
E.
Fengman Dam
Fengman Dam is a large hydroelectric gravity dam on the Songhua River in Jilin Province, China, known for its significant role in regional power generation and flood control.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889e37f308190a6aa0a69daff86c7 |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e46dbd122c8190a5db8c0088c81034 |
completed | April 19, 2026, 5:53 a.m. |
Created at: April 10, 2026, 5:52 a.m.