Triple
T17626483
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Long Beach, Mississippi |
E429856
|
entity |
| Predicate | transportation |
P230
|
FINISHED |
| Object | Mississippi Highway 605 |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Mississippi Highway 605 | Statement: [Long Beach, Mississippi, transportation, Mississippi Highway 605]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Mississippi Highway 605 Context triple: [Long Beach, Mississippi, transportation, Mississippi Highway 605]
-
A.
Mississippi Highway 603
Mississippi Highway 603 is a state highway in southern Mississippi that serves as a key north–south route connecting Bay St. Louis with inland communities in Hancock County.
-
B.
Mississippi Highway 69
Mississippi Highway 69 is a state highway in Mississippi that runs through the Columbus area in Lowndes County, connecting to the Alabama state line and serving as a regional route for local and through traffic.
-
C.
Mississippi Highway 503
Mississippi Highway 503 is a state highway in Mississippi that serves as a regional connector route in the east-central part of the state, including access to the town of Decatur.
-
D.
Mississippi Highway 468
Mississippi Highway 468 is a state highway in Mississippi that serves as a local connector route, including access to and from the city of Richland.
-
E.
Mississippi Highway 463
Mississippi Highway 463 is a state highway in central Mississippi that serves as a key connector route through the city of Ridgeland in Madison County.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Mississippi Highway 605 Target entity description: Mississippi Highway 605 is a state highway on the Mississippi Gulf Coast that serves as a key north–south route connecting Long Beach and surrounding communities to major regional roads and destinations.
-
A.
Mississippi Highway 603
Mississippi Highway 603 is a state highway in southern Mississippi that serves as a key north–south route connecting Bay St. Louis with inland communities in Hancock County.
-
B.
Mississippi Highway 69
Mississippi Highway 69 is a state highway in Mississippi that runs through the Columbus area in Lowndes County, connecting to the Alabama state line and serving as a regional route for local and through traffic.
-
C.
Mississippi Highway 503
Mississippi Highway 503 is a state highway in Mississippi that serves as a regional connector route in the east-central part of the state, including access to the town of Decatur.
-
D.
Mississippi Highway 468
Mississippi Highway 468 is a state highway in Mississippi that serves as a local connector route, including access to and from the city of Richland.
-
E.
Mississippi Highway 463
Mississippi Highway 463 is a state highway in central Mississippi that serves as a key connector route through the city of Ridgeland in Madison County.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889e37f308190a6aa0a69daff86c7 |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e46dbd122c8190a5db8c0088c81034 |
completed | April 19, 2026, 5:53 a.m. |
Created at: April 10, 2026, 5:52 a.m.