Triple
T17623163
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Paraná River hydroelectric system |
E429760
|
entity |
| Predicate | includesReservoir |
P79074
|
FINISHED |
| Object | Jupiá Reservoir |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jupiá Reservoir | Statement: [Paraná River hydroelectric system, includesReservoir, Jupiá Reservoir]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Jupiá Reservoir Context triple: [Paraná River hydroelectric system, includesReservoir, Jupiá Reservoir]
-
A.
Angostura Reservoir
Angostura Reservoir is a man-made lake in South Dakota used primarily for irrigation, recreation, and wildlife habitat.
-
B.
Alarcón Reservoir
Alarcón Reservoir is a major artificial lake in Spain used for water storage, irrigation, and hydroelectric power generation along the Júcar River.
-
C.
Itumbiara Reservoir
Itumbiara Reservoir is a large artificial lake in Brazil created for hydroelectric power generation and water regulation on the Paranaíba River.
-
D.
Jurumirim Reservoir
Jurumirim Reservoir is a large artificial lake in the state of São Paulo, Brazil, known for hydroelectric power generation, water regulation, and recreational activities.
-
E.
Itá Reservoir
Itá Reservoir is an artificial lake in southern Brazil formed by the Itá Dam on the Uruguay River, used primarily for hydroelectric power generation and regional water management.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Jupiá Reservoir Target entity description: Jupiá Reservoir is a major artificial lake on the Paraná River in Brazil, created to support hydroelectric power generation and water regulation in the region.
-
A.
Angostura Reservoir
Angostura Reservoir is a man-made lake in South Dakota used primarily for irrigation, recreation, and wildlife habitat.
-
B.
Alarcón Reservoir
Alarcón Reservoir is a major artificial lake in Spain used for water storage, irrigation, and hydroelectric power generation along the Júcar River.
-
C.
Itumbiara Reservoir
Itumbiara Reservoir is a large artificial lake in Brazil created for hydroelectric power generation and water regulation on the Paranaíba River.
-
D.
Jurumirim Reservoir
Jurumirim Reservoir is a large artificial lake in the state of São Paulo, Brazil, known for hydroelectric power generation, water regulation, and recreational activities.
-
E.
Itá Reservoir
Itá Reservoir is an artificial lake in southern Brazil formed by the Itá Dam on the Uruguay River, used primarily for hydroelectric power generation and regional water management.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889e37f308190a6aa0a69daff86c7 |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e46dba664c81909dcaf44779db5565 |
completed | April 19, 2026, 5:52 a.m. |
Created at: April 10, 2026, 5:52 a.m.