Triple

T17623162
Position Surface form Disambiguated ID Type / Status
Subject Paraná River hydroelectric system E429760 entity
Predicate includesReservoir P79074 FINISHED
Object Ilha Solteira Reservoir NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ilha Solteira Reservoir | Statement: [Paraná River hydroelectric system, includesReservoir, Ilha Solteira Reservoir]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ilha Solteira Reservoir
Context triple: [Paraná River hydroelectric system, includesReservoir, Ilha Solteira Reservoir]
  • A. Jurumirim Reservoir
    Jurumirim Reservoir is a large artificial lake in the state of São Paulo, Brazil, known for hydroelectric power generation, water regulation, and recreational activities.
  • B. Cabril Reservoir
    Cabril Reservoir is a major artificial lake in central Portugal, created by a dam on the Zêzere River and used for hydroelectric power generation, water storage, and recreation.
  • C. Guarapiranga Reservoir
    Guarapiranga Reservoir is a large artificial lake in the southern part of São Paulo, Brazil, serving as an important source of water supply and a popular site for recreation and water sports.
  • D. Itá Reservoir
    Itá Reservoir is an artificial lake in southern Brazil formed by the Itá Dam on the Uruguay River, used primarily for hydroelectric power generation and regional water management.
  • E. Ilha Solteira Dam chosen
    Ilha Solteira Dam is a major hydroelectric dam in Brazil that forms part of one of the country’s largest power-generating complexes on the Paraná River.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e37f308190a6aa0a69daff86c7 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e46dba664c81909dcaf44779db5565 completed April 19, 2026, 5:52 a.m.
Created at: April 10, 2026, 5:52 a.m.