Triple

T17623142
Position Surface form Disambiguated ID Type / Status
Subject Paraná River hydroelectric system E429760 entity
Predicate hasPart P35 FINISHED
Object Jupiá Dam NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Jupiá Dam | Statement: [Paraná River hydroelectric system, hasPart, Jupiá Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Jupiá Dam
Context triple: [Paraná River hydroelectric system, hasPart, Jupiá Dam]
  • A. Barra Bonita Dam
    Barra Bonita Dam is a hydroelectric and navigation dam complex in the state of São Paulo, Brazil, known for regulating the Tietê River and forming the Barra Bonita Reservoir.
  • B. Angostura Dam
    Angostura Dam is a hydroelectric power facility located on Chile’s Biobío River, contributing to the country’s renewable energy generation.
  • C. Angostura Dam
    Angostura Dam is a major hydroelectric dam in Mexico that forms part of the country’s important Grijalva River power generation system.
  • D. Arroyito Dam
    Arroyito Dam is a hydroelectric and flood-control dam located on Argentina’s Limay River in the Patagonia region.
  • E. Caruachi Dam
    Caruachi Dam is a large hydroelectric dam on the Caroní River in Venezuela that forms part of the Guri–Macagua–Caruachi power complex supplying a significant share of the country’s electricity.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Jupiá Dam
Target entity description: Jupiá Dam is a major hydroelectric dam on the Paraná River in Brazil, contributing significantly to the region’s power generation within the broader Paraná River hydroelectric complex.
  • A. Barra Bonita Dam
    Barra Bonita Dam is a hydroelectric and navigation dam complex in the state of São Paulo, Brazil, known for regulating the Tietê River and forming the Barra Bonita Reservoir.
  • B. Angostura Dam
    Angostura Dam is a hydroelectric power facility located on Chile’s Biobío River, contributing to the country’s renewable energy generation.
  • C. Angostura Dam
    Angostura Dam is a major hydroelectric dam in Mexico that forms part of the country’s important Grijalva River power generation system.
  • D. Arroyito Dam
    Arroyito Dam is a hydroelectric and flood-control dam located on Argentina’s Limay River in the Patagonia region.
  • E. Caruachi Dam
    Caruachi Dam is a large hydroelectric dam on the Caroní River in Venezuela that forms part of the Guri–Macagua–Caruachi power complex supplying a significant share of the country’s electricity.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e37f308190a6aa0a69daff86c7 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e46dba664c81909dcaf44779db5565 completed April 19, 2026, 5:52 a.m.
Created at: April 10, 2026, 5:52 a.m.