Triple

T17623141
Position Surface form Disambiguated ID Type / Status
Subject Paraná River hydroelectric system E429760 entity
Predicate hasPart P35 FINISHED
Object Ilha Solteira Dam NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ilha Solteira Dam | Statement: [Paraná River hydroelectric system, hasPart, Ilha Solteira Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ilha Solteira Dam
Context triple: [Paraná River hydroelectric system, hasPart, Ilha Solteira Dam]
  • A. Gouvães Dam
    Gouvães Dam is a hydroelectric dam in northern Portugal that forms part of the Tâmega River energy complex, contributing to regional power generation and water management.
  • B. Barra Bonita Dam
    Barra Bonita Dam is a hydroelectric and navigation dam complex in the state of São Paulo, Brazil, known for regulating the Tietê River and forming the Barra Bonita Reservoir.
  • C. Três Marias Dam
    Três Marias Dam is a large hydroelectric and flood-control dam in Brazil that forms one of the country’s major reservoirs on the São Francisco River.
  • D. Xingó Dam
    Xingó Dam is a large hydroelectric dam complex in northeastern Brazil that generates power and helps regulate the flow of the São Francisco River.
  • E. São Simão Dam
    São Simão Dam is a large hydroelectric power facility in Brazil known for generating electricity and forming the São Simão Reservoir on the Paranaíba River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Ilha Solteira Dam
Target entity description: Ilha Solteira Dam is a major hydroelectric dam in Brazil that forms part of one of the country’s largest power-generating complexes on the Paraná River.
  • A. Gouvães Dam
    Gouvães Dam is a hydroelectric dam in northern Portugal that forms part of the Tâmega River energy complex, contributing to regional power generation and water management.
  • B. Barra Bonita Dam
    Barra Bonita Dam is a hydroelectric and navigation dam complex in the state of São Paulo, Brazil, known for regulating the Tietê River and forming the Barra Bonita Reservoir.
  • C. Três Marias Dam
    Três Marias Dam is a large hydroelectric and flood-control dam in Brazil that forms one of the country’s major reservoirs on the São Francisco River.
  • D. Xingó Dam
    Xingó Dam is a large hydroelectric dam complex in northeastern Brazil that generates power and helps regulate the flow of the São Francisco River.
  • E. São Simão Dam
    São Simão Dam is a large hydroelectric power facility in Brazil known for generating electricity and forming the São Simão Reservoir on the Paranaíba River.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e37f308190a6aa0a69daff86c7 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e46dba664c81909dcaf44779db5565 completed April 19, 2026, 5:52 a.m.
Created at: April 10, 2026, 5:52 a.m.