Triple

T17623140
Position Surface form Disambiguated ID Type / Status
Subject Paraná River hydroelectric system E429760 entity
Predicate hasPart P35 FINISHED
Object Porto Primavera Dam NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Porto Primavera Dam | Statement: [Paraná River hydroelectric system, hasPart, Porto Primavera Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Porto Primavera Dam
Context triple: [Paraná River hydroelectric system, hasPart, Porto Primavera Dam]
  • A. Alto Tâmega Dam
    The Alto Tâmega Dam is a hydroelectric dam in northern Portugal that forms part of the Tâmega River energy and water management system.
  • B. Bouçã Dam
    Bouçã Dam is a hydroelectric dam and reservoir located on the Zêzere River in central Portugal.
  • C. Carraízo Dam
    Carraízo Dam is a major flood-control and water-supply structure in Puerto Rico that impounds the Loíza River to form the Carraízo Reservoir serving the San Juan metropolitan area.
  • D. Alicurá Dam
    Alicurá Dam is a large hydroelectric dam in Argentina’s Patagonia region, known for forming the Alicurá Reservoir and generating power on the Limay River.
  • E. Gouvães Dam
    Gouvães Dam is a hydroelectric dam in northern Portugal that forms part of the Tâmega River energy complex, contributing to regional power generation and water management.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Porto Primavera Dam
Target entity description: Porto Primavera Dam is a large hydroelectric dam on the Paraná River in Brazil, known for its significant power generation capacity and role in regional water management.
  • A. Alto Tâmega Dam
    The Alto Tâmega Dam is a hydroelectric dam in northern Portugal that forms part of the Tâmega River energy and water management system.
  • B. Bouçã Dam
    Bouçã Dam is a hydroelectric dam and reservoir located on the Zêzere River in central Portugal.
  • C. Carraízo Dam
    Carraízo Dam is a major flood-control and water-supply structure in Puerto Rico that impounds the Loíza River to form the Carraízo Reservoir serving the San Juan metropolitan area.
  • D. Alicurá Dam
    Alicurá Dam is a large hydroelectric dam in Argentina’s Patagonia region, known for forming the Alicurá Reservoir and generating power on the Limay River.
  • E. Gouvães Dam
    Gouvães Dam is a hydroelectric dam in northern Portugal that forms part of the Tâmega River energy complex, contributing to regional power generation and water management.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e37f308190a6aa0a69daff86c7 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e46dba664c81909dcaf44779db5565 completed April 19, 2026, 5:52 a.m.
Created at: April 10, 2026, 5:52 a.m.