Triple

T17620697
Position Surface form Disambiguated ID Type / Status
Subject AC propulsion E429700 entity
Predicate instanceOf P0 FINISHED
Object electric traction technology C19359 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: electric traction technology
Context triple: [AC propulsion, instanceOf, electric traction technology]
  • A. electrified railway
    An electrified railway is a rail transport system in which trains receive power from external electrical sources, such as overhead lines or third rails, instead of relying on onboard fuel.
  • B. electric transport system chosen
    An electric transport system is an integrated network of vehicles, infrastructure, and control technologies that enables the movement of people or goods using electricity as the primary energy source.
  • C. electrified railway operation
    Electrified railway operation is the management and control of train services powered by electrical energy supplied through overhead lines or third rails, encompassing infrastructure, rolling stock, power systems, and operational procedures to ensure safe, efficient, and reliable transport.
  • D. third rail electrification system
    A third rail electrification system is a method of providing electric power to trains via an additional rail mounted alongside or between the running rails, from which current is collected by contact shoes on the train.
  • E. public transport technology
    Public transport technology encompasses the systems, vehicles, infrastructure, and digital tools used to plan, operate, and optimize shared transportation services such as buses, trains, trams, and metros.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e37f308190a6aa0a69daff86c7 completed April 10, 2026, 5:25 a.m.
Created at: April 10, 2026, 5:51 a.m.