Triple
T17620648
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | New Technology Train |
E429699
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | New York City Subway rolling stock family |
C15202
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: New York City Subway rolling stock family Context triple: [New Technology Train, instanceOf, New York City Subway rolling stock family]
-
A.
New York City Subway rolling stock class
chosen
A New York City Subway rolling stock class is a standardized group of subway cars sharing common design, technical specifications, and operational characteristics used on the NYC subway system.
-
B.
New York City Subway yard
A New York City Subway yard is a specialized facility where subway trains are stored, inspected, maintained, and dispatched between periods of service.
-
C.
New York City Subway service designation
A New York City Subway service designation is a letter, number, or symbol that identifies a specific subway route, indicating its line, terminals, and general service pattern for riders.
-
D.
New York City Subway tunnel
A New York City Subway tunnel is an underground passageway engineered to safely guide subway trains, utilities, and related infrastructure beneath the city’s surface between stations.
-
E.
New York City Subway infrastructure project
A New York City Subway infrastructure project is a coordinated planning, construction, and modernization effort aimed at building, upgrading, or maintaining the physical and technological systems that support subway service across the city.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889e37f308190a6aa0a69daff86c7 |
completed | April 10, 2026, 5:25 a.m. |
Created at: April 10, 2026, 5:51 a.m.