Triple
T17616415
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Liptovská Mara |
E429093
|
entity |
| Predicate | operator |
P179
|
FINISHED |
| Object | Slovenský vodohospodársky podnik |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Slovenský vodohospodársky podnik | Statement: [Liptovská Mara, operator, Slovenský vodohospodársky podnik]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Slovenský vodohospodársky podnik Context triple: [Liptovská Mara, operator, Slovenský vodohospodársky podnik]
-
A.
Slovenské elektrárne
Slovenské elektrárne is Slovakia’s largest electricity producer, operating major hydroelectric and nuclear power plants across the country.
-
B.
Slovenske železnice
Slovenske železnice is Slovenia’s national railway company, responsible for operating the country’s passenger and freight rail services and managing much of its rail infrastructure.
-
C.
Liptovská Mara Hydroelectric Power Plant
Liptovská Mara Hydroelectric Power Plant is a Slovak hydroelectric facility that generates electricity using water from the Liptovská Mara reservoir on the Váh River.
-
D.
Gabčíkovo
Gabčíkovo is a Slovak town best known for the nearby Gabčíkovo Dam on the Danube River, a major hydroelectric and flood-control project.
-
E.
Orava Hydroelectric Power Plant
Orava Hydroelectric Power Plant is a Slovak hydroelectric facility that generates electricity using water from the Orava Reservoir in northern Slovakia.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Slovenský vodohospodársky podnik Target entity description: Slovenský vodohospodársky podnik is a state-owned Slovak water management company responsible for the operation and maintenance of major water structures, reservoirs, and flood protection systems across Slovakia.
-
A.
Slovenské elektrárne
Slovenské elektrárne is Slovakia’s largest electricity producer, operating major hydroelectric and nuclear power plants across the country.
-
B.
Slovenske železnice
Slovenske železnice is Slovenia’s national railway company, responsible for operating the country’s passenger and freight rail services and managing much of its rail infrastructure.
-
C.
Liptovská Mara Hydroelectric Power Plant
Liptovská Mara Hydroelectric Power Plant is a Slovak hydroelectric facility that generates electricity using water from the Liptovská Mara reservoir on the Váh River.
-
D.
Gabčíkovo
Gabčíkovo is a Slovak town best known for the nearby Gabčíkovo Dam on the Danube River, a major hydroelectric and flood-control project.
-
E.
Orava Hydroelectric Power Plant
Orava Hydroelectric Power Plant is a Slovak hydroelectric facility that generates electricity using water from the Orava Reservoir in northern Slovakia.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889e1c6148190ba76241e74688f8b |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e46d32991c81909801161b0a416c94 |
completed | April 19, 2026, 5:50 a.m. |
Created at: April 10, 2026, 5:51 a.m.