Triple

T17610232
Position Surface form Disambiguated ID Type / Status
Subject Langley Aerodrome E428947 entity
Predicate instanceOf P0 FINISHED
Object experimental powered flying machine C6075 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: experimental powered flying machine
Context triple: [Langley Aerodrome, instanceOf, experimental powered flying machine]
  • A. experimental aircraft chosen
    An experimental aircraft is a prototype or testbed airplane designed and operated to evaluate new aerodynamic concepts, materials, systems, or technologies outside standard certified production models.
  • B. experimental aircraft program series
    A coordinated sequence of research and development efforts focused on designing, building, testing, and evaluating prototype aircraft to explore new aerospace technologies, performance capabilities, and operational concepts.
  • C. jet-powered hydroplane
    A jet-powered hydroplane is a high-speed watercraft that uses jet propulsion and a specialized hull design to skim across the water’s surface with minimal drag.
  • D. rocket-powered aircraft
    A rocket-powered aircraft is a type of airplane that uses rocket engines for primary thrust, enabling very high speeds and altitudes over relatively short flight durations.
  • E. pilotless aircraft
    A pilotless aircraft is an unmanned aerial vehicle that operates without an onboard human pilot, controlled either remotely or autonomously via onboard systems.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e1c6148190ba76241e74688f8b completed April 10, 2026, 5:25 a.m.
Created at: April 10, 2026, 5:51 a.m.