Triple

T17598674
Position Surface form Disambiguated ID Type / Status
Subject Oracle Grid Infrastructure E428637 entity
Predicate instanceOf P0 FINISHED
Object high-availability software C15503 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: high-availability software
Context triple: [Oracle Grid Infrastructure, instanceOf, high-availability software]
  • A. high-availability solution chosen
    A high-availability solution is an architecture and set of mechanisms designed to ensure that a system or service remains continuously operational and accessible with minimal downtime, even in the face of failures or maintenance activities.
  • B. high availability solution
    A high availability solution is a system design and set of mechanisms that ensure critical services remain continuously accessible with minimal downtime, even in the face of failures or maintenance activities.
  • C. high-performance computing software
    High-performance computing software consists of specialized programs and frameworks designed to efficiently execute large-scale, compute-intensive tasks by exploiting parallelism and advanced hardware architectures such as clusters, supercomputers, and GPUs.
  • D. disaster recovery solution
    A disaster recovery solution is a comprehensive system of tools, processes, and policies designed to quickly restore critical IT services and data after disruptive events, minimizing downtime and business impact.
  • E. high-performance computing system
    A high-performance computing system is an integrated collection of powerful processors, high-speed interconnects, and optimized software designed to perform large-scale, complex computations at very high speeds.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e1030481909950e140c63255b9 completed April 10, 2026, 5:25 a.m.
Created at: April 10, 2026, 5:51 a.m.