Triple
T17597721
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Peace Bridge (Derry) |
E428616
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | self-anchored suspension bridge |
C402
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: self-anchored suspension bridge Context triple: [Peace Bridge (Derry), instanceOf, self-anchored suspension bridge]
-
A.
suspension bridge
chosen
A suspension bridge is a type of bridge in which the deck is hung below large main cables that are anchored at each end and pass over tall towers, allowing it to span long distances.
-
B.
cable-stayed bridge
A cable-stayed bridge is a type of bridge in which the deck is directly supported by multiple cables connected to one or more towers or pylons, efficiently distributing loads and allowing for long spans with a distinctive, fan-like or harp-like appearance.
-
C.
cantilever bridge
A cantilever bridge is a structure that spans a distance using projecting beams or trusses anchored at only one end, which extend outward to support the bridge deck without intermediate supports.
-
D.
twin-span bridge
A twin-span bridge is a structure composed of two parallel bridge spans, typically used to carry traffic in opposite directions or to increase capacity across a single crossing.
-
E.
beam bridge
A beam bridge is a simple type of bridge consisting of a horizontal beam supported at its ends by piers or abutments, carrying loads primarily through bending.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889e1030481909950e140c63255b9 |
completed | April 10, 2026, 5:25 a.m. |
Created at: April 10, 2026, 5:51 a.m.