Triple
T17596829
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hetch Hetchy Power System |
E428593
|
entity |
| Predicate | hasPart |
P35
|
FINISHED |
| Object | Moccasin Low-Head Generating Plant |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Moccasin Low-Head Generating Plant | Statement: [Hetch Hetchy Power System, hasPart, Moccasin Low-Head Generating Plant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Moccasin Low-Head Generating Plant Context triple: [Hetch Hetchy Power System, hasPart, Moccasin Low-Head Generating Plant]
-
A.
Stevenson Dam Hydroelectric Plant
Stevenson Dam Hydroelectric Plant is a hydroelectric power station in Connecticut that generates electricity using water impounded by the Stevenson Dam on the Housatonic River.
-
B.
Pullinque Hydroelectric Plant
Pullinque Hydroelectric Plant is a hydroelectric power facility in southern Chile that generates electricity using water resources associated with Pullinque Lake.
-
C.
Parker Dam powerplant
Parker Dam powerplant is a hydroelectric generating facility on the Colorado River that produces power and supports water management as part of the broader Parker-Davis Project.
-
D.
Denison Dam Power Plant
Denison Dam Power Plant is a hydroelectric generating facility located at Denison Dam on the Red River, producing renewable electricity from the dam’s reservoir outflows.
-
E.
Narrows Hydroelectric Plant
The Narrows Hydroelectric Plant is a hydroelectric power station that generates electricity using water impounded by Narrows Dam.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Moccasin Low-Head Generating Plant Target entity description: The Moccasin Low-Head Generating Plant is a hydroelectric power facility in California that forms part of the Hetch Hetchy system supplying electricity to the San Francisco Bay Area.
-
A.
Stevenson Dam Hydroelectric Plant
Stevenson Dam Hydroelectric Plant is a hydroelectric power station in Connecticut that generates electricity using water impounded by the Stevenson Dam on the Housatonic River.
-
B.
Pullinque Hydroelectric Plant
Pullinque Hydroelectric Plant is a hydroelectric power facility in southern Chile that generates electricity using water resources associated with Pullinque Lake.
-
C.
Parker Dam powerplant
Parker Dam powerplant is a hydroelectric generating facility on the Colorado River that produces power and supports water management as part of the broader Parker-Davis Project.
-
D.
Denison Dam Power Plant
Denison Dam Power Plant is a hydroelectric generating facility located at Denison Dam on the Red River, producing renewable electricity from the dam’s reservoir outflows.
-
E.
Narrows Hydroelectric Plant
The Narrows Hydroelectric Plant is a hydroelectric power station that generates electricity using water impounded by Narrows Dam.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889e1030481909950e140c63255b9 |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e469ec335c8190abcaff700cfff23b |
completed | April 19, 2026, 5:36 a.m. |
Created at: April 10, 2026, 5:51 a.m.