Triple

T17592159
Position Surface form Disambiguated ID Type / Status
Subject Gare de Caen E428473 entity
Predicate operator P179 FINISHED
Object SNCF NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: SNCF | Statement: [Gare de Caen, operator, SNCF]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: SNCF
Context triple: [Gare de Caen, operator, SNCF]
  • A. SNCF chosen
    SNCF is France’s national state-owned railway company, responsible for operating the country’s passenger and freight rail services and much of its rail infrastructure.
  • B. SNCF Réseau
    SNCF Réseau is the French state-owned rail infrastructure manager responsible for operating, maintaining, and developing France’s national railway network.
  • C. SNCF Sud-Est region
    The SNCF Sud-Est region was a major operating division of the French national railway company responsible for managing and running rail services in the southeastern part of France, including key routes linking Paris with Lyon and the Mediterranean.
  • D. OUIGO
    OUIGO is a low-cost high-speed train service operated by France’s national railway company SNCF, offering budget-friendly travel on major routes.
  • E. Francorail
    Francorail was a French railway manufacturing consortium known for producing high-speed trainsets, including early models of the TGV.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e1030481909950e140c63255b9 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e469e79dac8190953a1ce8fc015b20 completed April 19, 2026, 5:36 a.m.
Created at: April 10, 2026, 5:51 a.m.