Triple

T17582409
Position Surface form Disambiguated ID Type / Status
Subject Lurigancho-Chosica District E428235 entity
Predicate roadAccessVia P9041 FINISHED
Object Carretera Central NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Carretera Central | Statement: [Lurigancho-Chosica District, roadAccessVia, Carretera Central]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Carretera Central
Context triple: [Lurigancho-Chosica District, roadAccessVia, Carretera Central]
  • A. Carretera Central
    Carretera Central is a major Cuban highway that runs the length of the island, connecting key cities and provinces, including Pinar del Río.
  • B. Carretera Central chosen
    Carretera Central is a major Peruvian highway that connects Lima with the country’s central highlands and interior regions.
  • C. Avenida Central
    Avenida Central is a major thoroughfare in the district of Carmen, known for its central location and urban activity.
  • D. Ortega Highway
    Ortega Highway is a scenic and winding mountain road in Southern California that connects Orange and Riverside counties through the Santa Ana Mountains.
  • E. Avenida Tobalaba
    Avenida Tobalaba is a major thoroughfare in Santiago, Chile, running through several communes and serving as an important urban transit and commercial corridor.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889e1030481909950e140c63255b9 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e463cf556881908d2935b3761f65df completed April 19, 2026, 5:10 a.m.
Created at: April 10, 2026, 5:50 a.m.