Triple
T17559869
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ports Collection |
E427671
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | package build framework |
C30694
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: package build framework Context triple: [Ports Collection, instanceOf, package build framework]
-
A.
front-end build tool
A front-end build tool is a software utility that automates tasks like bundling, transpiling, optimizing, and managing assets for client-side web applications.
-
B.
production framework
A production framework is a structured set of tools, processes, and guidelines that standardize and streamline the creation, deployment, and maintenance of products or services in a consistent, scalable way.
-
C.
build system generator
chosen
A build system generator is a tool that automatically produces platform-specific build configuration files (such as Makefiles or project files) from a higher-level project description.
-
D.
build configuration language
A build configuration language is a specialized, often declarative language used to define how software should be compiled, linked, packaged, and deployed across different environments and platforms.
-
E.
library building program
A library building program is an organized initiative that plans, funds, designs, and constructs or renovates library facilities to meet community information, learning, and cultural needs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889e0385081908a04b66f4dd4bd0d |
completed | April 10, 2026, 5:25 a.m. |
Created at: April 10, 2026, 5:50 a.m.