Triple
T17559186
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CDE |
E427655
|
entity |
| Predicate | openSourceReleaseMonth |
P79647
|
FINISHED |
| Object | August |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: August | Statement: [CDE, openSourceReleaseMonth, August]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: openSourceReleaseMonth Context triple: [CDE, openSourceReleaseMonth, August]
-
A.
openSourceReleaseDate
chosen
Indicates the date on which a piece of software was first released under an open-source license.
-
B.
announcedInMonth
Indicates that an announcement or declaration occurred during a specified calendar month.
-
C.
proposedInMonth
Indicates that an entity (such as a proposal or plan) was formally proposed during a specific calendar month.
-
D.
publicationMonth
Indicates the calendar month in which a publication was released or made publicly available.
-
E.
betaReleaseDate
Indicates the date on which a product or system is first released in its beta version for testing or limited use.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889e0385081908a04b66f4dd4bd0d |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e45624bfe08190991dc088394a5af4 |
completed | April 19, 2026, 4:12 a.m. |
| PD | Predicate disambiguation | batch_69e3b4fb39948190a82a597c5bac5c57 |
completed | April 18, 2026, 4:44 p.m. |
Created at: April 10, 2026, 5:50 a.m.