Triple
T17558970
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ignite-UX |
E427651
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | deployment tool |
C9685
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: deployment tool Context triple: [Ignite-UX, instanceOf, deployment tool]
-
A.
developer tool
A developer tool is a software application or utility designed to help programmers create, test, debug, and maintain code more efficiently.
-
B.
software build and distribution system
chosen
A software build and distribution system automates compiling source code, packaging artifacts, and delivering them reliably to target environments or end users.
-
C.
application lifecycle management platform
An application lifecycle management platform is an integrated system that supports planning, development, testing, deployment, maintenance, and governance of software applications throughout their entire lifecycle.
-
D.
system administration tool
A system administration tool is software that helps IT professionals manage, configure, monitor, and automate tasks across computer systems and networks.
-
E.
site management tool
A site management tool is a software application that centralizes and streamlines the planning, monitoring, and control of all activities, resources, and configurations associated with operating and maintaining a website or physical site.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889e0385081908a04b66f4dd4bd0d |
completed | April 10, 2026, 5:25 a.m. |
Created at: April 10, 2026, 5:50 a.m.