Triple
T17556230
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CRAF |
E427597
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | civil reserve air fleet program |
C4666
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: civil reserve air fleet program Context triple: [CRAF, instanceOf, civil reserve air fleet program]
-
A.
airlift program
chosen
An airlift program is an organized operation that uses aircraft to rapidly transport people, equipment, or supplies—often in response to emergencies, military needs, or humanitarian crises.
-
B.
reserve component of the United States Air Force
The reserve component of the United States Air Force is the part-time military force composed of Air Force Reserve and Air National Guard units that support and augment the active-duty Air Force during peacetime and wartime operations.
-
C.
United States freight program
A United States freight program is a coordinated set of policies, investments, and initiatives designed to improve the efficiency, safety, capacity, and environmental performance of the nation’s freight transportation system across modes such as trucking, rail, maritime, and air cargo.
-
D.
military air transport organization
A military air transport organization is a structured entity responsible for planning, coordinating, and executing the airlift of personnel, equipment, and supplies to support military operations and strategic objectives.
-
E.
airlift
Airlift is a logistical operation that transports people, equipment, or supplies by aircraft, typically over long distances or into areas difficult to reach by land or sea.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889df6dc081908f67dbadc03c07ee |
completed | April 10, 2026, 5:25 a.m. |
Created at: April 10, 2026, 5:50 a.m.