Triple
T17556111
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | CRAF Stage I |
E427594
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | activation stage of the Civil Reserve Air Fleet |
C39107
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: activation stage of the Civil Reserve Air Fleet Context triple: [CRAF Stage I, instanceOf, activation stage of the Civil Reserve Air Fleet]
-
A.
reserve component of the United States Air Force
The reserve component of the United States Air Force is the part-time military force composed of Air Force Reserve and Air National Guard units that support and augment the active-duty Air Force during peacetime and wartime operations.
-
B.
airlift program
An airlift program is an organized operation that uses aircraft to rapidly transport people, equipment, or supplies—often in response to emergencies, military needs, or humanitarian crises.
-
C.
United States freight program
A United States freight program is a coordinated set of policies, investments, and initiatives designed to improve the efficiency, safety, capacity, and environmental performance of the nation’s freight transportation system across modes such as trucking, rail, maritime, and air cargo.
-
D.
auxiliary air force
An auxiliary air force is a supplementary aviation component that supports a nation's primary air force through roles such as training, logistics, civil defense, and non-combat operations, often staffed by reservists or volunteers.
-
E.
airlift
Airlift is a logistical operation that transports people, equipment, or supplies by aircraft, typically over long distances or into areas difficult to reach by land or sea.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889df6dc081908f67dbadc03c07ee |
completed | April 10, 2026, 5:25 a.m. |
Created at: April 10, 2026, 5:50 a.m.