Triple

T17543513
Position Surface form Disambiguated ID Type / Status
Subject Parker-Davis Project E427264 entity
Predicate relatedProject P2830 FINISHED
Object Colorado River Storage Project NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Colorado River Storage Project | Statement: [Parker-Davis Project, relatedProject, Colorado River Storage Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Colorado River Storage Project
Context triple: [Parker-Davis Project, relatedProject, Colorado River Storage Project]
  • A. Boulder Canyon Project
    The Boulder Canyon Project was a major U.S. federal public works initiative of the early 20th century that authorized and funded the construction of Hoover Dam and related infrastructure on the Colorado River for flood control, irrigation, and hydroelectric power.
  • B. Colorado River Storage and Regulation System chosen
    The Colorado River Storage and Regulation System is a network of dams, reservoirs, and related infrastructure designed to manage, store, and control the flow of the Colorado River for water supply, flood control, and hydroelectric power generation.
  • C. Shoshone Project
    The Shoshone Project is a U.S. Bureau of Reclamation irrigation and water management development in Wyoming that harnesses the Shoshone River through dams, reservoirs, and canals to support agriculture and regional growth.
  • D. Rio Grande Project
    The Rio Grande Project is a major U.S. Bureau of Reclamation irrigation and water management initiative on the Rio Grande that supplies water for agriculture, municipalities, and flood control in southern New Mexico and western Texas.
  • E. Colorado-Big Thompson Project
    The Colorado-Big Thompson Project is a major transbasin water diversion and storage system in Colorado that delivers Colorado River water to the arid eastern plains for agriculture, cities, and industry.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889df6dc081908f67dbadc03c07ee completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e4545fe29c8190a586c75419fa14ea completed April 19, 2026, 4:04 a.m.
Created at: April 10, 2026, 5:49 a.m.