Triple

T17541756
Position Surface form Disambiguated ID Type / Status
Subject STS-3 E427215 entity
Predicate instanceOf P0 FINISHED
Object Space Shuttle Columbia mission C5891 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Space Shuttle Columbia mission
Context triple: [STS-3, instanceOf, Space Shuttle Columbia mission]
  • A. Space Shuttle mission chosen
    A Space Shuttle mission is a coordinated spaceflight operation using the Space Shuttle orbiter to transport crew, cargo, and conduct scientific or technical objectives in Earth orbit and beyond.
  • B. Space Shuttle Endeavour
    Space Shuttle Endeavour is a retired NASA orbiter that served as a reusable spacecraft for transporting astronauts, satellites, and scientific payloads to and from low Earth orbit as part of the Space Shuttle program.
  • C. space shuttle orbiter
    A space shuttle orbiter is a reusable winged spacecraft designed to carry crew and cargo to and from low Earth orbit, operate as an orbital laboratory or platform, and then re-enter the atmosphere and land like an airplane.
  • D. NASA space mission
    A NASA space mission is a coordinated, goal-driven endeavor planned and executed by NASA to explore, observe, or utilize space using specialized spacecraft, instruments, and supporting ground operations.
  • E. International Space Station expedition
    An International Space Station expedition is a long-duration mission during which a designated crew lives and works aboard the ISS to conduct scientific research, perform maintenance, and support ongoing space operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889df6dc081908f67dbadc03c07ee completed April 10, 2026, 5:25 a.m.
Created at: April 10, 2026, 5:49 a.m.