Triple

T17541755
Position Surface form Disambiguated ID Type / Status
Subject STS-3 E427215 entity
Predicate instanceOf P0 FINISHED
Object NASA Space Shuttle mission C5891 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: NASA Space Shuttle mission
Context triple: [STS-3, instanceOf, NASA Space Shuttle mission]
  • A. Space Shuttle mission chosen
    A Space Shuttle mission is a coordinated spaceflight operation using the Space Shuttle orbiter to transport crew, cargo, and conduct scientific or technical objectives in Earth orbit and beyond.
  • B. NASA space mission
    A NASA space mission is a coordinated, goal-driven endeavor planned and executed by NASA to explore, observe, or utilize space using specialized spacecraft, instruments, and supporting ground operations.
  • C. SpaceX mission
    A SpaceX mission is a coordinated aerospace operation conducted by SpaceX to transport payloads or crew to specific destinations in space, such as Earth orbit, the International Space Station, or beyond.
  • D. NASA spacecraft program
    A NASA spacecraft program is an organized initiative that designs, develops, launches, and operates one or more spacecraft to achieve specific scientific, exploratory, or technological objectives in space.
  • E. International Space Station expedition
    An International Space Station expedition is a long-duration mission during which a designated crew lives and works aboard the ISS to conduct scientific research, perform maintenance, and support ongoing space operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889df6dc081908f67dbadc03c07ee completed April 10, 2026, 5:25 a.m.
Created at: April 10, 2026, 5:49 a.m.