Triple
T17540043
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | The House of Kinross (alterations) |
E427168
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | historic building modification |
C5502
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: historic building modification Context triple: [The House of Kinross (alterations), instanceOf, historic building modification]
-
A.
building alteration
chosen
A building alteration is a modification or change to an existing structure’s design, layout, or components that does not constitute complete demolition or new construction.
-
B.
historic architecture
Historic architecture encompasses buildings and structures from past eras that embody the cultural, technological, and artistic values of the time in which they were created.
-
C.
historic building section
A historic building section is a vertical cut-through representation of an older, culturally or architecturally significant structure that reveals its internal organization, construction methods, and spatial relationships over time.
-
D.
revitalized historic building
A revitalized historic building is a preserved architectural structure that has been thoughtfully restored and modernized to serve contemporary functions while maintaining its original character and cultural significance.
-
E.
historic preservation project
A historic preservation project is a coordinated effort to identify, protect, restore, and maintain buildings, sites, or artifacts of historical, cultural, or architectural significance for present and future generations.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889df6dc081908f67dbadc03c07ee |
completed | April 10, 2026, 5:25 a.m. |
Created at: April 10, 2026, 5:49 a.m.