Triple

T1752775
Position Surface form Disambiguated ID Type / Status
Subject Ghataprabha River E38482 entity
Predicate hasHydropowerFacility P15311 FINISHED
Object Ghataprabha hydroelectric installations E204355 NE FINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Ghataprabha hydroelectric installations | Statement: [Ghataprabha River, hasHydropowerFacility, Ghataprabha hydroelectric installations]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Ghataprabha hydroelectric installations
Context triple: [Ghataprabha River, hasHydropowerFacility, Ghataprabha hydroelectric installations]
  • A. Kishanganga Hydroelectric Plant
    The Kishanganga Hydroelectric Plant is a run-of-the-river hydroelectric power station in Jammu and Kashmir, India, built on a tributary of the Jhelum to generate electricity and support regional water management.
  • B. Shivanasamudra Hydroelectric Station
    Shivanasamudra Hydroelectric Station is one of India’s oldest hydroelectric power plants, built on the Kaveri River in Karnataka to generate electricity from its waterfalls.
  • C. Ghataprabha Dam chosen
    Ghataprabha Dam is a major irrigation and hydroelectric dam in Karnataka, India, built across the Ghataprabha River to support agriculture and water supply in the region.
  • D. Hathni Kund Barrage
    Hathni Kund Barrage is a major diversion and flood-control structure on the Yamuna River in the Indian state of Haryana, crucial for regulating water supply to northern India.
  • E. Indira Sagar Dam
    Indira Sagar Dam is a large multipurpose concrete dam on the Narmada River in Madhya Pradesh, India, known for its significant hydroelectric power generation and irrigation capacity.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasHydropowerFacility
Context triple: [Ghataprabha River, hasHydropowerFacility, Ghataprabha hydroelectric installations]
  • A. hasHydroelectricProject chosen
    Indicates that an entity is associated with, operates, or contains a hydroelectric power generation project.
  • B. hydropowerPotential
    Indicates the amount of energy that could be generated from water resources at a given site or region under specified conditions.
  • C. hydroelectricStationCommissioned
    Indicates that a hydroelectric power station has been officially brought into operation or service on a specific date or in a specific context.
  • D. hydroelectricStationCapacity
    Indicates the maximum amount of electrical power that a hydroelectric station is capable of producing under specified conditions.
  • E. hasHydrologicalFunction
    Indicates that something performs a role or action related to the movement, storage, or regulation of water within a hydrological system.
  • F. None of above.

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a8862bdb2081908aefe831c8aa8017 completed March 4, 2026, 7:21 p.m.
NER Named-entity recognition batch_69aba6a63f588190b53b39c6b97d74f4 completed March 7, 2026, 4:16 a.m.
NED1 Entity disambiguation (via context triple) batch_69add1b679d88190b3c6e50c96f917e4 completed March 8, 2026, 7:44 p.m.
PD Predicate disambiguation batch_69aa61c7ef4c8190abec87c96a787d82 completed March 6, 2026, 5:10 a.m.
Created at: March 4, 2026, 7:31 p.m.