Triple

T17519744
Position Surface form Disambiguated ID Type / Status
Subject SwaggerHub E426653 entity
Predicate instanceOf P0 FINISHED
Object API design platform C31293 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: API design platform
Context triple: [SwaggerHub, instanceOf, API design platform]
  • A. API documentation tool
    An API documentation tool is a software system that automatically generates, organizes, and presents clear, up-to-date reference and usage information for application programming interfaces.
  • B. API management service chosen
    An API management service is a platform that enables organizations to design, secure, publish, monitor, and analyze APIs throughout their lifecycle, ensuring reliable and controlled access to backend services.
  • C. software development API
    A software development API is a defined set of interfaces, protocols, and tools that allow different software components or systems to communicate and interact programmatically.
  • D. API framework
    An API framework is a structured set of tools, libraries, and conventions that simplifies designing, building, documenting, and managing application programming interfaces.
  • E. no-code application development platform
    A no-code application development platform is a software environment that enables users to design, build, and deploy applications through visual interfaces and prebuilt components without writing traditional programming code.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889de677081909b22d2657b1f0292 completed April 10, 2026, 5:25 a.m.
Created at: April 10, 2026, 5:49 a.m.