Triple

T17503382
Position Surface form Disambiguated ID Type / Status
Subject Blowering E426248 entity
Predicate locatedNear P294 FINISHED
Object Blowering Dam NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Blowering Dam | Statement: [Blowering, locatedNear, Blowering Dam]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Blowering Dam
Context triple: [Blowering, locatedNear, Blowering Dam]
  • A. Blowering Dam chosen
    Blowering Dam is a major rockfill embankment dam on the Tumut River in New South Wales, Australia, forming Blowering Reservoir and playing a key role in hydroelectric power generation, irrigation, and flood mitigation within the Murrumbidgee catchment.
  • B. Canning Dam
    Canning Dam is a major water supply reservoir and dam in Western Australia that provides drinking water to the Perth metropolitan area.
  • C. Yates Dam
    Yates Dam is a hydroelectric dam located on the Tallapoosa River in Alabama, used primarily for power generation and water management.
  • D. Talbingo Dam
    Talbingo Dam is a major rockfill embankment dam in New South Wales, Australia, forming part of the Snowy Mountains Scheme and creating Talbingo Reservoir for hydroelectric power generation and water storage.
  • E. Jindabyne Dam
    Jindabyne Dam is a major rock-fill embankment dam in New South Wales, Australia, built as part of the Snowy Mountains Scheme to provide hydroelectric power generation and water diversion.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889dd9164819087b1dc3c9240c870 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e45213a0e88190ac183d87ec088e86 completed April 19, 2026, 3:54 a.m.
Created at: April 10, 2026, 5:48 a.m.