Triple

T17498594
Position Surface form Disambiguated ID Type / Status
Subject Port of Skagway E426136 entity
Predicate instanceOf P0 FINISHED
Object deep-water harbor C16012 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: deep-water harbor
Context triple: [Port of Skagway, instanceOf, deep-water harbor]
  • A. coastal harbour chosen
    A coastal harbour is a sheltered area along a shoreline where the sea meets the land, providing safe anchorage and facilities for ships and boats to dock, load, and unload.
  • B. dry dock
    A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
  • C. deep water mass
    A deep water mass is a large, relatively homogeneous body of seawater formed at high latitudes that sinks and spreads through the deep ocean, characterized by distinct temperature, salinity, and chemical properties.
  • D. fishing port
    A fishing port is a coastal harbor facility where fishing vessels dock to unload catches, refuel, maintain equipment, and support the commercial fishing industry through processing, storage, and distribution services.
  • E. shore establishment
    A shore establishment is a land-based facility that supports naval or maritime operations through administration, logistics, training, maintenance, or other essential services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889dccf7481909264a1844a2e9100 completed April 10, 2026, 5:25 a.m.
Created at: April 10, 2026, 5:48 a.m.