Triple

T17470189
Position Surface form Disambiguated ID Type / Status
Subject Lotru River E425388 entity
Predicate hasHydropowerPlant P15311 FINISHED
Object Lotru-Ciunget Hydropower Plant NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Lotru-Ciunget Hydropower Plant | Statement: [Lotru River, hasHydropowerPlant, Lotru-Ciunget Hydropower Plant]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Lotru-Ciunget Hydropower Plant
Context triple: [Lotru River, hasHydropowerPlant, Lotru-Ciunget Hydropower Plant]
  • A. Er'tan Hydropower Station
    Er'tan Hydropower Station is a major hydroelectric power facility in Sichuan, China, known for its large arch dam and role in regional power generation and tourism.
  • B. Fierza Hydroelectric Power Station
    Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
  • C. Sima Hydroelectric Power Station
    The Sima Hydroelectric Power Station is a major Norwegian underground hydroelectric facility known for harnessing the waters of the Hardanger region to generate significant renewable energy.
  • D. Tinfos II Hydroelectric Power Station
    Tinfos II Hydroelectric Power Station is an early 20th-century Norwegian hydroelectric facility that played a key role in powering the industrial development of the Rjukan–Notodden region.
  • E. Peligre hydroelectric plant
    The Peligre hydroelectric plant is a major dam and power station in Haiti that provides a significant portion of the country’s electricity by harnessing the flow of the Artibonite River.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Lotru-Ciunget Hydropower Plant
Target entity description: The Lotru-Ciunget Hydropower Plant is a major Romanian hydroelectric facility that harnesses the Lotru River to generate electricity for the national grid.
  • A. Er'tan Hydropower Station
    Er'tan Hydropower Station is a major hydroelectric power facility in Sichuan, China, known for its large arch dam and role in regional power generation and tourism.
  • B. Fierza Hydroelectric Power Station
    Fierza Hydroelectric Power Station is a major hydroelectric facility in northern Albania, forming part of the Drin River cascade and serving as one of the country’s largest sources of electricity.
  • C. Sima Hydroelectric Power Station
    The Sima Hydroelectric Power Station is a major Norwegian underground hydroelectric facility known for harnessing the waters of the Hardanger region to generate significant renewable energy.
  • D. Tinfos II Hydroelectric Power Station
    Tinfos II Hydroelectric Power Station is an early 20th-century Norwegian hydroelectric facility that played a key role in powering the industrial development of the Rjukan–Notodden region.
  • E. Peligre hydroelectric plant
    The Peligre hydroelectric plant is a major dam and power station in Haiti that provides a significant portion of the country’s electricity by harnessing the flow of the Artibonite River.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889dbc2e88190b18ea6115e819258 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e451aad4a08190be7e25841da8e952 completed April 19, 2026, 3:53 a.m.
Created at: April 10, 2026, 5:47 a.m.