Triple
T17460222
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Rokan River |
E425131
|
entity |
| Predicate | locatedInRiverBasin |
P18951
|
FINISHED |
| Object | Rokan River basin |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Rokan River basin | Statement: [Rokan River, locatedInRiverBasin, Rokan River basin]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Rokan River basin Context triple: [Rokan River, locatedInRiverBasin, Rokan River basin]
-
A.
Rokan River
The Rokan River is a major river in Sumatra, Indonesia, flowing through Riau Province and playing an important role in regional transportation, ecology, and local livelihoods.
-
B.
Asahan River
The Asahan River is a major river in northern Sumatra, Indonesia, flowing from Lake Toba to the Strait of Malacca and supporting regional hydroelectric power and irrigation.
-
C.
Đà River basin
The Đà River basin is a major river system in northwestern Vietnam that drains mountainous regions and supports hydropower, agriculture, and settlements such as those in Hòa Bình Province.
-
D.
Siak River
The Siak River is a major waterway in Riau Province on the island of Sumatra, Indonesia, historically important for trade and transportation and flowing through the city of Pekanbaru before emptying into the Strait of Malacca.
-
E.
Sumbar River basin
The Sumbar River basin is a drainage area in the Kopet Dag region of Central Asia, encompassing the river’s catchment and surrounding mountainous landscapes.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Rokan River basin Target entity description: The Rokan River basin is a drainage area in Riau Province, Sumatra, Indonesia, encompassing the watershed and surrounding landscapes that feed and are shaped by the Rokan River.
-
A.
Rokan River
chosen
The Rokan River is a major river in Sumatra, Indonesia, flowing through Riau Province and playing an important role in regional transportation, ecology, and local livelihoods.
-
B.
Asahan River
The Asahan River is a major river in northern Sumatra, Indonesia, flowing from Lake Toba to the Strait of Malacca and supporting regional hydroelectric power and irrigation.
-
C.
Đà River basin
The Đà River basin is a major river system in northwestern Vietnam that drains mountainous regions and supports hydropower, agriculture, and settlements such as those in Hòa Bình Province.
-
D.
Siak River
The Siak River is a major waterway in Riau Province on the island of Sumatra, Indonesia, historically important for trade and transportation and flowing through the city of Pekanbaru before emptying into the Strait of Malacca.
-
E.
Sumbar River basin
The Sumbar River basin is a drainage area in the Kopet Dag region of Central Asia, encompassing the river’s catchment and surrounding mountainous landscapes.
- F. None of above.
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889db0ba481908402409af3b37917 |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e451a3031c8190ab1dd0d41b002dd2 |
completed | April 19, 2026, 3:53 a.m. |
Created at: April 10, 2026, 5:47 a.m.