Triple

T17459449
Position Surface form Disambiguated ID Type / Status
Subject Kumba E425114 entity
Predicate hasTransportConnection P845 FINISHED
Object Kumba–Mamfe road NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kumba–Mamfe road | Statement: [Kumba, hasTransportConnection, Kumba–Mamfe road]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Kumba–Mamfe road
Context triple: [Kumba, hasTransportConnection, Kumba–Mamfe road]
  • A. Bamenda–Mbouda road
    The Bamenda–Mbouda road is a major roadway in western Cameroon that links the city of Bamenda with Mbouda, serving as an important regional transport corridor.
  • B. Mpulungu–Mbala road
    The Mpulungu–Mbala road is a key transport route in northern Zambia linking the lakeside town of Mpulungu with the inland town of Mbala, facilitating regional trade and travel.
  • C. Kabale–Kisoro road
    The Kabale–Kisoro road is a major highway in southwestern Uganda that connects the town of Kabale to Kisoro near the borders with Rwanda and the Democratic Republic of the Congo, serving as an important route for regional trade and tourism.
  • D. Mbarara–Ishaka Road
    Mbarara–Ishaka Road is a major paved highway in western Uganda that links the city of Mbarara to the town of Ishaka, facilitating regional trade and transport.
  • E. Karuma–Pakwach road
    The Karuma–Pakwach road is a major transport route in northern Uganda that connects the Karuma area to the town of Pakwach, facilitating regional trade and access to Murchison Falls National Park.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Kumba–Mamfe road
Target entity description: The Kumba–Mamfe road is a key highway in southwestern Cameroon that links the town of Kumba to Mamfe and serves as an important route for regional trade and travel.
  • A. Bamenda–Mbouda road
    The Bamenda–Mbouda road is a major roadway in western Cameroon that links the city of Bamenda with Mbouda, serving as an important regional transport corridor.
  • B. Mpulungu–Mbala road
    The Mpulungu–Mbala road is a key transport route in northern Zambia linking the lakeside town of Mpulungu with the inland town of Mbala, facilitating regional trade and travel.
  • C. Kabale–Kisoro road
    The Kabale–Kisoro road is a major highway in southwestern Uganda that connects the town of Kabale to Kisoro near the borders with Rwanda and the Democratic Republic of the Congo, serving as an important route for regional trade and tourism.
  • D. Mbarara–Ishaka Road
    Mbarara–Ishaka Road is a major paved highway in western Uganda that links the city of Mbarara to the town of Ishaka, facilitating regional trade and transport.
  • E. Karuma–Pakwach road
    The Karuma–Pakwach road is a major transport route in northern Uganda that connects the Karuma area to the town of Pakwach, facilitating regional trade and access to Murchison Falls National Park.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889db0ba481908402409af3b37917 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e451444e008190944d9668d4d901fa completed April 19, 2026, 3:51 a.m.
Created at: April 10, 2026, 5:47 a.m.