Triple
T17442809
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | 马鞍山 |
E424699
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | 长江沿岸城市 |
C38756
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: 长江沿岸城市 Context triple: [马鞍山, instanceOf, 长江沿岸城市]
-
A.
district of Wuhan
A district of Wuhan is an administrative subdivision of the prefecture-level city of Wuhan, China, responsible for local governance, public services, and regional development within its defined urban or suburban area.
-
B.
district of Chongqing
A district of Chongqing is an administrative subdivision of the Chongqing municipality in China, functioning as a local governing unit responsible for regional governance, public services, and economic development within its designated urban or rural area.
-
C.
广域市
广域市是一种行政区划形式,通常指辖区范围较大、既包含中心城市又包括周边乡镇和农村地区的地级或副省级城市。
-
D.
district of Shanghai
A district of Shanghai is an administrative subdivision of the Shanghai municipality that governs a specific urban or suburban area, providing local services, infrastructure, and regulation.
-
E.
subregion of Hunan
A subregion of Hunan is a geographically or administratively defined part of Hunan Province characterized by shared cultural, economic, or environmental features that distinguish it from other areas within the province.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889db0ba481908402409af3b37917 |
completed | April 10, 2026, 5:25 a.m. |
Created at: April 10, 2026, 5:47 a.m.