Triple
T17426370
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Spacecraft Test and Assembly Building |
E423748
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | space center building |
C38740
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: space center building Context triple: [Spacecraft Test and Assembly Building, instanceOf, space center building]
-
A.
spaceflight center
A spaceflight center is a facility dedicated to the planning, development, testing, and control of spacecraft and space missions.
-
B.
spaceport facility
A spaceport facility is a complex of specialized infrastructure and services designed to support the launch, landing, maintenance, and logistical operations of spacecraft and their crews.
-
C.
NASA center
A NASA center is a major facility or campus operated by the National Aeronautics and Space Administration that conducts research, development, testing, and mission operations in specific areas of aerospace and space exploration.
-
D.
spaceport facility component
A spaceport facility component is an individual physical or functional element—such as launch pads, control centers, fueling systems, or passenger terminals—that collectively enables the operation, support, and management of spaceflight activities at a spaceport.
-
E.
NASA spaceport
A NASA spaceport is a specialized aerospace facility where NASA prepares, launches, and sometimes recovers spacecraft and launch vehicles for missions into space.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889d88b6081908bada047f5b3ba51 |
completed | April 10, 2026, 5:25 a.m. |
Created at: April 10, 2026, 5:46 a.m.