Triple

T17424160
Position Surface form Disambiguated ID Type / Status
Subject Route nationale 20 E423693 entity
Predicate formsPartOfCorridor P2566 FINISHED
Object Paris–Toulouse road axis NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Paris–Toulouse road axis | Statement: [Route nationale 20, formsPartOfCorridor, Paris–Toulouse road axis]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Paris–Toulouse road axis
Context triple: [Route nationale 20, formsPartOfCorridor, Paris–Toulouse road axis]
  • A. Route Nationale 1
    Route Nationale 1 is a major national highway on Réunion Island that connects the capital, Saint-Denis, with key coastal towns along the island’s north and west.
  • B. Bordeaux ring road
    The Bordeaux ring road is a major orbital highway encircling the city of Bordeaux, France, connecting several national and regional motorways and helping to divert through-traffic away from the city center.
  • C. Paris–Chartres–Le Mans axis
    The Paris–Chartres–Le Mans axis is a major French railway and transport corridor linking Paris with the cities of Chartres and Le Mans.
  • D. Paris–Nice TGV route
    The Paris–Nice TGV route is a high-speed rail service in France that connects the capital Paris with the Mediterranean city of Nice, linking northern and southern regions via the national TGV network.
  • E. Paris–Normandy corridor
    The Paris–Normandy corridor is a major French transport axis linking the Paris region with the ports and cities of Normandy, serving as a key route for both passenger and freight traffic.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Paris–Toulouse road axis
Target entity description: The Paris–Toulouse road axis is a major north–south transportation corridor in France linking the capital Paris with the southwestern city of Toulouse.
  • A. Route Nationale 1
    Route Nationale 1 is a major national highway on Réunion Island that connects the capital, Saint-Denis, with key coastal towns along the island’s north and west.
  • B. Bordeaux ring road
    The Bordeaux ring road is a major orbital highway encircling the city of Bordeaux, France, connecting several national and regional motorways and helping to divert through-traffic away from the city center.
  • C. Paris–Chartres–Le Mans axis
    The Paris–Chartres–Le Mans axis is a major French railway and transport corridor linking Paris with the cities of Chartres and Le Mans.
  • D. Paris–Nice TGV route
    The Paris–Nice TGV route is a high-speed rail service in France that connects the capital Paris with the Mediterranean city of Nice, linking northern and southern regions via the national TGV network.
  • E. Paris–Normandy corridor
    The Paris–Normandy corridor is a major French transport axis linking the Paris region with the ports and cities of Normandy, serving as a key route for both passenger and freight traffic.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889d88b6081908bada047f5b3ba51 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e4423999ac81909fdbd8bcffcb30c9 completed April 19, 2026, 2:47 a.m.
Created at: April 10, 2026, 5:46 a.m.