Triple

T17420582
Position Surface form Disambiguated ID Type / Status
Subject Srinagar (Garhwal) E423600 entity
Predicate nearbyHydroProject P119354 FINISHED
Object Srinagar Hydroelectric Project NE NERFINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Srinagar Hydroelectric Project | Statement: [Srinagar (Garhwal), nearbyHydroProject, Srinagar Hydroelectric Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Srinagar Hydroelectric Project
Context triple: [Srinagar (Garhwal), nearbyHydroProject, Srinagar Hydroelectric Project]
  • A. Parbati Hydroelectric Project
    The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
  • B. Bhadra Hydel Project
    Bhadra Hydel Project is a hydroelectric power station in Karnataka, India, that harnesses the flow of the Bhadra River to generate electricity and support regional irrigation.
  • C. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • D. Ujjani Hydroelectric Project
    Ujjani Hydroelectric Project is a power-generating facility in Maharashtra, India, that harnesses the water stored by the Ujjani Dam to produce hydroelectric energy.
  • E. Teesta V Hydroelectric Project
    Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Srinagar Hydroelectric Project
Target entity description: The Srinagar Hydroelectric Project is a major run-of-the-river power plant on the Alaknanda River in Uttarakhand, India, built to generate electricity and support regional power needs.
  • A. Parbati Hydroelectric Project
    The Parbati Hydroelectric Project is a major hydroelectric power development in Himachal Pradesh, India, designed to harness the Parbati River for large-scale electricity generation.
  • B. Bhadra Hydel Project
    Bhadra Hydel Project is a hydroelectric power station in Karnataka, India, that harnesses the flow of the Bhadra River to generate electricity and support regional irrigation.
  • C. Shimsha Hydroelectric Project
    Shimsha Hydroelectric Project is one of Karnataka’s early hydroelectric power stations, built on the Shimsha River to generate electricity using its water flow.
  • D. Ujjani Hydroelectric Project
    Ujjani Hydroelectric Project is a power-generating facility in Maharashtra, India, that harnesses the water stored by the Ujjani Dam to produce hydroelectric energy.
  • E. Teesta V Hydroelectric Project
    Teesta V Hydroelectric Project is a major hydroelectric power station in Sikkim, India, harnessing the Teesta River to generate electricity for the region.
  • F. None of above. chosen
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: nearbyHydroProject
Context triple: [Srinagar (Garhwal), nearbyHydroProject, Srinagar Hydroelectric Project]
  • A. nearbyRiverProject
    Indicates that there is a project located close to or associated with a nearby river.
  • B. nearIrrigationProject
    Indicates that one entity is located close to or in the vicinity of an irrigation project.
  • C. nearbyBasin
    Indicates that one basin is located close to another basin in space.
  • D. nearbyProject chosen
    Indicates that one entity is located close to or in the immediate vicinity of another entity or project.
  • E. hasNearbyWaterInfrastructure
    Indicates that a location or entity is situated close to water-related infrastructure such as pipes, treatment facilities, or distribution systems.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889d7d27c819088486ce3f0627fa1 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e442372954819085f332efc7067ae9 completed April 19, 2026, 2:47 a.m.
PD Predicate disambiguation batch_69e3b02e6cc88190986e85e64ce9383e completed April 18, 2026, 4:24 p.m.
Created at: April 10, 2026, 5:46 a.m.