Triple
T17413067
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kot Addu |
E423416
|
entity |
| Predicate | hasNotableFacility |
P105
|
FINISHED |
| Object | Kot Addu Power Company (KAPCO) power plant |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Kot Addu Power Company (KAPCO) power plant | Statement: [Kot Addu, hasNotableFacility, Kot Addu Power Company (KAPCO) power plant]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Kot Addu Power Company (KAPCO) power plant Context triple: [Kot Addu, hasNotableFacility, Kot Addu Power Company (KAPCO) power plant]
-
A.
Anpara Thermal Power Station
Anpara Thermal Power Station is a large coal-fired power plant in Uttar Pradesh, India, that plays a major role in supplying electricity to the region.
-
B.
Kota Super Thermal Power Station
Kota Super Thermal Power Station is a major coal-fired power plant in Rajasthan, India, that supplies electricity to the surrounding region and contributes significantly to the state's power generation capacity.
-
C.
Markaba power station
Markaba power station is a hydroelectric facility in Lebanon that harnesses the flow of the Litani River to generate electricity.
-
D.
Liapootah Power Station
Liapootah Power Station is a hydroelectric power facility in Tasmania, Australia, that forms part of the state's extensive Derwent River power scheme.
-
E.
Guddu Thermal Power Station
Guddu Thermal Power Station is a major thermal power plant in Pakistan that plays a key role in supplying electricity to the country’s national grid.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Kot Addu Power Company (KAPCO) power plant Target entity description: The Kot Addu Power Company (KAPCO) power plant is a major multi-fuel thermal power station in Pakistan that plays a significant role in the country’s electricity generation.
-
A.
Anpara Thermal Power Station
Anpara Thermal Power Station is a large coal-fired power plant in Uttar Pradesh, India, that plays a major role in supplying electricity to the region.
-
B.
Kota Super Thermal Power Station
Kota Super Thermal Power Station is a major coal-fired power plant in Rajasthan, India, that supplies electricity to the surrounding region and contributes significantly to the state's power generation capacity.
-
C.
Markaba power station
Markaba power station is a hydroelectric facility in Lebanon that harnesses the flow of the Litani River to generate electricity.
-
D.
Liapootah Power Station
Liapootah Power Station is a hydroelectric power facility in Tasmania, Australia, that forms part of the state's extensive Derwent River power scheme.
-
E.
Guddu Thermal Power Station
Guddu Thermal Power Station is a major thermal power plant in Pakistan that plays a key role in supplying electricity to the country’s national grid.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889d7d27c819088486ce3f0627fa1 |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e43b0c12b881908b2ddc13678c7a75 |
completed | April 19, 2026, 2:16 a.m. |
Created at: April 10, 2026, 5:46 a.m.