Triple

T17412842
Position Surface form Disambiguated ID Type / Status
Subject Memorial Tunnel (former) E423411 entity
Predicate replacedBy P101 FINISHED
Object Paint Creek Mountain highway bypass NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Paint Creek Mountain highway bypass | Statement: [Memorial Tunnel (former), replacedBy, Paint Creek Mountain highway bypass]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Paint Creek Mountain highway bypass
Context triple: [Memorial Tunnel (former), replacedBy, Paint Creek Mountain highway bypass]
  • A. Smithtown Bypass
    Smithtown Bypass is a major arterial roadway on Long Island that serves as a key east–west commuter and commercial route through the Smithtown area.
  • B. Sellersville Bypass
    Sellersville Bypass is a limited-access roadway segment in Bucks County, Pennsylvania, designed to route Pennsylvania Route 309 traffic around the borough of Sellersville to reduce congestion and improve travel flow.
  • C. U.S. Route 30 Bypass
    U.S. Route 30 Bypass is an alternate alignment of U.S. Route 30 that diverts traffic around central Portland, Oregon, to provide a more direct and less congested route for through travelers.
  • D. Warm Springs Highway
    Warm Springs Highway is a named segment of U.S. Route 26 in Oregon that passes through the Warm Springs region, serving as a key east–west transportation corridor in that area.
  • E. Paint Creek Trail
    Paint Creek Trail is a popular multi-use recreational rail trail in southeastern Michigan known for its scenic route along Paint Creek through several Oakland County communities.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Paint Creek Mountain highway bypass
Target entity description: Paint Creek Mountain highway bypass is a modern roadway in West Virginia constructed to reroute traffic around the former Memorial Tunnel along the West Virginia Turnpike.
  • A. Smithtown Bypass
    Smithtown Bypass is a major arterial roadway on Long Island that serves as a key east–west commuter and commercial route through the Smithtown area.
  • B. Sellersville Bypass
    Sellersville Bypass is a limited-access roadway segment in Bucks County, Pennsylvania, designed to route Pennsylvania Route 309 traffic around the borough of Sellersville to reduce congestion and improve travel flow.
  • C. U.S. Route 30 Bypass
    U.S. Route 30 Bypass is an alternate alignment of U.S. Route 30 that diverts traffic around central Portland, Oregon, to provide a more direct and less congested route for through travelers.
  • D. Warm Springs Highway
    Warm Springs Highway is a named segment of U.S. Route 26 in Oregon that passes through the Warm Springs region, serving as a key east–west transportation corridor in that area.
  • E. Paint Creek Trail
    Paint Creek Trail is a popular multi-use recreational rail trail in southeastern Michigan known for its scenic route along Paint Creek through several Oakland County communities.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889d7d27c819088486ce3f0627fa1 completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e43b0c12b881908b2ddc13678c7a75 completed April 19, 2026, 2:16 a.m.
Created at: April 10, 2026, 5:46 a.m.