Triple
T17401164
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | EastLink |
E423089
|
entity |
| Predicate | hasJunctionWith |
P1018
|
FINISHED |
| Object | Peninsula Link |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Peninsula Link | Statement: [EastLink, hasJunctionWith, Peninsula Link]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Peninsula Link Context triple: [EastLink, hasJunctionWith, Peninsula Link]
-
A.
Island Line Causeway
Island Line Causeway is a scenic former rail causeway in Lake Champlain, Vermont, now used as part of a popular multi-use recreational trail with striking water and mountain views.
-
B.
Sitra Causeway
Sitra Causeway is a major roadway bridge in Bahrain that links the island of Sitra to the main island, facilitating key commuter and industrial traffic.
-
C.
Canso Causeway
The Canso Causeway is a rock-fill transportation link in eastern Canada that connects Cape Breton Island to mainland Nova Scotia, carrying both road and rail traffic across the Strait of Canso.
-
D.
Lekki–Ikoyi Link Bridge
The Lekki–Ikoyi Link Bridge is a prominent cable-stayed bridge in Lagos, Nigeria, known for connecting the Lekki and Ikoyi districts and serving as both a key transport route and a city landmark.
-
E.
Melbourne Causeway
The Melbourne Causeway is a major bridge and roadway in Florida that spans the Indian River Lagoon, connecting the city of Melbourne on the mainland to the barrier island communities along the Atlantic coast.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Peninsula Link Target entity description: Peninsula Link is a major freeway in Melbourne, Australia, that connects the Mornington Peninsula to the city’s broader freeway network.
-
A.
Island Line Causeway
Island Line Causeway is a scenic former rail causeway in Lake Champlain, Vermont, now used as part of a popular multi-use recreational trail with striking water and mountain views.
-
B.
Sitra Causeway
Sitra Causeway is a major roadway bridge in Bahrain that links the island of Sitra to the main island, facilitating key commuter and industrial traffic.
-
C.
Canso Causeway
The Canso Causeway is a rock-fill transportation link in eastern Canada that connects Cape Breton Island to mainland Nova Scotia, carrying both road and rail traffic across the Strait of Canso.
-
D.
Lekki–Ikoyi Link Bridge
The Lekki–Ikoyi Link Bridge is a prominent cable-stayed bridge in Lagos, Nigeria, known for connecting the Lekki and Ikoyi districts and serving as both a key transport route and a city landmark.
-
E.
Melbourne Causeway
The Melbourne Causeway is a major bridge and roadway in Florida that spans the Indian River Lagoon, connecting the city of Melbourne on the mainland to the barrier island communities along the Atlantic coast.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889d710288190bf0f4762801fefae |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e43ac126788190b51323bde3c9ba69 |
completed | April 19, 2026, 2:15 a.m. |
Created at: April 10, 2026, 5:45 a.m.