Triple

T17400275
Position Surface form Disambiguated ID Type / Status
Subject Clemson, South Carolina E423066 entity
Predicate transportInfrastructure P1777 FINISHED
Object South Carolina Highway 93 NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: South Carolina Highway 93 | Statement: [Clemson, South Carolina, transportInfrastructure, South Carolina Highway 93]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: South Carolina Highway 93
Context triple: [Clemson, South Carolina, transportInfrastructure, South Carolina Highway 93]
  • A. South Carolina Highway 90
    South Carolina Highway 90 is a state highway in Horry County that serves as a key connector between Conway and coastal communities near Myrtle Beach.
  • B. South Carolina Highway 9
    South Carolina Highway 9 is a primary state highway running across northern South Carolina, connecting multiple communities and serving as a key east–west transportation route.
  • C. South Carolina Highway 59
    South Carolina Highway 59 is a primary state highway in northwestern South Carolina that connects the city of Seneca to nearby communities and regional routes.
  • D. South Carolina Highway 57
    South Carolina Highway 57 is a primary state highway in northeastern South Carolina that runs through rural communities and connects parts of Dillon County to nearby regional routes.
  • E. South Carolina Highway 8
    South Carolina Highway 8 is a primary state highway in northwestern South Carolina that runs through Pickens County, connecting several small towns and rural communities.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: South Carolina Highway 93
Target entity description: South Carolina Highway 93 is a state highway serving as a primary local connector through Clemson, South Carolina, linking the city’s downtown, university area, and surrounding routes.
  • A. South Carolina Highway 90
    South Carolina Highway 90 is a state highway in Horry County that serves as a key connector between Conway and coastal communities near Myrtle Beach.
  • B. South Carolina Highway 9
    South Carolina Highway 9 is a primary state highway running across northern South Carolina, connecting multiple communities and serving as a key east–west transportation route.
  • C. South Carolina Highway 59
    South Carolina Highway 59 is a primary state highway in northwestern South Carolina that connects the city of Seneca to nearby communities and regional routes.
  • D. South Carolina Highway 57
    South Carolina Highway 57 is a primary state highway in northeastern South Carolina that runs through rural communities and connects parts of Dillon County to nearby regional routes.
  • E. South Carolina Highway 8
    South Carolina Highway 8 is a primary state highway in northwestern South Carolina that runs through Pickens County, connecting several small towns and rural communities.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889d710288190bf0f4762801fefae completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e43ac0596481908c400916d5c1b971 completed April 19, 2026, 2:15 a.m.
Created at: April 10, 2026, 5:45 a.m.