Triple
T17391130
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Miramar station |
E422824
|
entity |
| Predicate | servesLine |
P839
|
FINISHED |
| Object | Limache–Puerto route |
—
|
NE NERFINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Limache–Puerto route | Statement: [Miramar station, servesLine, Limache–Puerto route]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Limache–Puerto route Context triple: [Miramar station, servesLine, Limache–Puerto route]
-
A.
La Paz–Puno route
The La Paz–Puno route is a key international transport corridor linking Bolivia’s administrative capital La Paz with the Peruvian city of Puno on Lake Titicaca, facilitating cross-border travel and trade.
-
B.
Chile Route 7
Chile Route 7, also known as the Carretera Austral, is a remote and scenic highway in southern Chile that winds through Patagonia’s fjords, forests, and national parks.
-
C.
Arequipa–Juliaca highway
The Arequipa–Juliaca highway is a major road in southern Peru that connects the city of Arequipa with Juliaca across the Andean highlands.
-
D.
Chile Route 60
Chile Route 60 is a major highway in central Chile that connects the coastal city of Valparaíso with the Andes and the Argentine border, serving as a key international transit corridor.
-
E.
Ruta Nacional 19
Ruta Nacional 19 is a major Argentine highway that connects the cities of Santa Fe and Córdoba, serving as an important corridor in the country's central region.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: Limache–Puerto route Target entity description: The Limache–Puerto route is a commuter rail line in Chile’s Valparaíso Region that connects inland Limache with the coastal city of Valparaíso, serving key urban and suburban stations along the way.
-
A.
La Paz–Puno route
The La Paz–Puno route is a key international transport corridor linking Bolivia’s administrative capital La Paz with the Peruvian city of Puno on Lake Titicaca, facilitating cross-border travel and trade.
-
B.
Chile Route 7
Chile Route 7, also known as the Carretera Austral, is a remote and scenic highway in southern Chile that winds through Patagonia’s fjords, forests, and national parks.
-
C.
Arequipa–Juliaca highway
The Arequipa–Juliaca highway is a major road in southern Peru that connects the city of Arequipa with Juliaca across the Andean highlands.
-
D.
Chile Route 60
Chile Route 60 is a major highway in central Chile that connects the coastal city of Valparaíso with the Andes and the Argentine border, serving as a key international transit corridor.
-
E.
Ruta Nacional 19
Ruta Nacional 19 is a major Argentine highway that connects the cities of Santa Fe and Córdoba, serving as an important corridor in the country's central region.
- F. None of above. chosen
Provenance (2 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69d889d710288190bf0f4762801fefae |
completed | April 10, 2026, 5:25 a.m. |
| NER | Named-entity recognition | batch_69e43aba5398819096846bdeefde0788 |
completed | April 19, 2026, 2:15 a.m. |
Created at: April 10, 2026, 5:45 a.m.