Triple

T17389517
Position Surface form Disambiguated ID Type / Status
Subject Escanaba River E422778 entity
Predicate hasHydroelectricPlant P15311 FINISHED
Object Escanaba Hydroelectric Project NE NERFINISHED

How this triple was built (3 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Escanaba Hydroelectric Project | Statement: [Escanaba River, hasHydroelectricPlant, Escanaba Hydroelectric Project]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Escanaba Hydroelectric Project
Context triple: [Escanaba River, hasHydroelectricPlant, Escanaba Hydroelectric Project]
  • A. Cushman Hydroelectric Project
    The Cushman Hydroelectric Project is a hydroelectric power generation system in Washington State that uses Lake Cushman and associated dams and facilities to produce electricity.
  • B. Oak Grove Hydroelectric Project
    Oak Grove Hydroelectric Project is a hydroelectric power facility in Oregon that generates electricity by harnessing the flow of the Oak Grove Fork of the Clackamas River.
  • C. Beaver Dam Hydroelectric Plant
    Beaver Dam Hydroelectric Plant is a hydroelectric power facility in Arkansas that generates electricity using water impounded by Beaver Lake on the White River.
  • D. Pullinque Hydroelectric Plant
    Pullinque Hydroelectric Plant is a hydroelectric power facility in southern Chile that generates electricity using water resources associated with Pullinque Lake.
  • E. Howard A. Hanson Dam project
    The Howard A. Hanson Dam project is a major flood-control and water management infrastructure initiative on Washington’s Green River that protects downstream communities in the Puget Sound region.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Escanaba Hydroelectric Project
Target entity description: The Escanaba Hydroelectric Project is a hydroelectric power facility on Michigan’s Escanaba River that generates electricity by harnessing the river’s flow.
  • A. Cushman Hydroelectric Project
    The Cushman Hydroelectric Project is a hydroelectric power generation system in Washington State that uses Lake Cushman and associated dams and facilities to produce electricity.
  • B. Oak Grove Hydroelectric Project
    Oak Grove Hydroelectric Project is a hydroelectric power facility in Oregon that generates electricity by harnessing the flow of the Oak Grove Fork of the Clackamas River.
  • C. Beaver Dam Hydroelectric Plant
    Beaver Dam Hydroelectric Plant is a hydroelectric power facility in Arkansas that generates electricity using water impounded by Beaver Lake on the White River.
  • D. Pullinque Hydroelectric Plant
    Pullinque Hydroelectric Plant is a hydroelectric power facility in southern Chile that generates electricity using water resources associated with Pullinque Lake.
  • E. Howard A. Hanson Dam project
    The Howard A. Hanson Dam project is a major flood-control and water management infrastructure initiative on Washington’s Green River that protects downstream communities in the Puget Sound region.
  • F. None of above. chosen

Provenance (2 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69d889d710288190bf0f4762801fefae completed April 10, 2026, 5:25 a.m.
NER Named-entity recognition batch_69e43a8c718c81909cb20749aaf12897 completed April 19, 2026, 2:14 a.m.
Created at: April 10, 2026, 5:45 a.m.